Cisco Headend System Release 2.5 Information Guide

Page of 3
 
 
Product End-of-Life Notice 
© 2011 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public Information. 
Page 1 of 3 
End-of-Sale and End-of-Life Announcement for the Cisco Digital 
Network Control System (DNCS) - System Release Batch EOL 
EOL7434 
Cisco announces the end-of-sale and end-of-life dates for the Cisco
®
 Digital Network Control System 
(DNCS) - System Release Batch EOL. The last day to order the affected product(s) is August 29, 2011. 
Customers with active service contracts or active warranties will continue to receive support from the 
Cisco Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the 
end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists the product part 
numbers affected by this announcement. For customers with active service contracts or active product 
warranties, support will be available for the shown dates as stated in the applicable service contracts or 
product warranty terms and conditions, even if this date exceeds the Last Date of Support shown in 
Table 1. 
Table 1. 
End-of-Life Milestones and Dates for the Cisco Digital Network Control System (DNCS) - System Release Batch EOL 
Milestone 
Definition 
Date 
End-of-Life 
Announcement Date 
The date the document that announces the end-of-sale and end-of-life of a product is 
distributed to the general public. 
February 28, 2011 
End-of-Sale Date 
The last date to order the product through Cisco point-of-sale mechanisms. The product 
is no longer for sale after this date. 
August 29, 2011 
Last Ship Date: 
OS SW 
The last-possible ship date that can be requested of Cisco and/or its contract 
manufacturers. Actual ship date is dependent on lead time. 
November 27, 2011 
End of SW Maintenance 
Releases Date: 
OS SW 
The last date that Cisco Engineering may release any final software maintenance 
releases or bug fixes. After this date, Cisco Engineering will no longer develop, repair, 
maintain, or test the product software. 
August 28, 2012 
End of New Service 
Attachment Date: 
OS SW 
For equipment and software that is not covered by a service-and-support contract, this is 
the last date to order a new service-and-support contract or add the equipment and/or 
software to an existing service-and-support contract. 
August 28, 2012 
End of Service Contract 
Renewal Date: 
OS SW 
The last date to extend or renew a service contract for the product. 
November 24, 2013 
Last Date of Support: 
 
The last expected date to receive service and support for the product as entitled by 
applicable service contracts or warranty terms and conditions **. After this date, all 
support services for the product are unavailable, and the product becomes obsolete. 
Warranty duration is based on product ship dates; refer to warranty terms and conditions 
for details. 
August 31, 2014 
HW = Hardware 
OS SW = Operating System Software 
App. SW = Application Software 
Table 2. 
Product Part Numbers Affected by This Announcement 
End-of-Sale Product 
Part Number 
Product Description 
Replacement Product Part 
Number 
Replacement Product 
Description 
Additional Information 
4009934 
Remote Network Control 
Server SW v1.0 
See the Product Migration 
Options section below for 
detailed information on 
replacing this product. 
 
 
4014053 
DNCS SR 4.2,New System 
Sale 
See the Product Migration 
Options section below for 
detailed information on 
replacing this product.