Cisco Cisco E-Mail Manager Unity Integration Option Installation Guide

Page of 180
Example for determining the disk space needed to complete the migration:
Database Used Space (DUS) = 71,680 MB
Copy/drop table size (TTSA) = 56,128 MB
Largest Copy/drop table size (maxTSL) = 36,496 MB
Required Disk Space = ((2 * 71,680) – 56,128) + 2(36,496) = 160,224 MB
Temp DB Size
Step 1
Ensure the Temp DB Log is able to expand to 3 GB.
Step 2
Ensure the Temp DB is able to expand to 50% of the DUS.
Upgrade Paths
There are two Logger and HDS migration paths:
Technology Refresh
The Technology Refresh path is followed by customers replacing their existing Logger and/or
HDS servers with new hardware.
Common Ground
The Common Ground path supports customers using the same Logger and/or HDS hardware
to run ICM/IPCC 7.0.
The data migration set is identical regardless of the migration path one chooses to follow.
Technology Refresh involves:
Backup/Copy/Restore
Data Migration
Common Ground only involves:
Data Migration
Upgrade Guide Cisco ICM/IPCC Enterprise & Hosted Editions Release 7.0(0)
30
Chapter 5: - ICM/IPCC 7.0(0) Upgrade Time and Space Requirements
Database Migration Performance