Cisco Cisco IP Contact Center Release 4.6.1 Installation Guide

Page of 180
Logger Upgrade Procedures
Logger Pre-upgrade Preparation
Pre-upgrade preparation is an integral part of the upgrade process. Perform the following on
the Logger to assist in recovery in the event of a catastrophic upgrade failure:
Step 1
Perform a full SQL backup of the ICM DB.
Step 2
Perform a full SQL backup of the Outbound DB if applicable.
Step 3
Record the current size of the log files.
Step 4
Copy the Cisco registry key.
Step 5
Copy the ICM/bin directory.
Logger Technology Refresh Upgrade: Side A/B
The following procedure is used to perform a Technology Refresh upgrade on both sides of the
Logger. When upgrading Side A use the procedure as is. When upgrading Side B, simply replace
“Side A” with “Side B” in the procedure.
Note: Important: The Windows Firewall configuration scripts must be deployed before this
server can accept network connections. This is done as part of the staging tasks.
How to perform a TR upgrade on the Logger
1. Disable configuration changes.
Upgrade Guide Cisco ICM/IPCC Enterprise & Hosted Editions Release 7.0(0)
85
 Chapter 9