Cisco Cisco IPCC Web Option Installation Guide

Page of 180
Performance Considerations
During internal testing, hyper-threading has consistently doubled the time it took the database
migration to complete; therefore, to minimize migration time one should disable hyper-threading.
Ways to Reduce Data Migration Time
How to reduce data migration time:
Reduce database size.
Purge the Logger DB of all data already replicated to the HDS (25 GB or less)
Remove any unneeded records, especially RCD, RCV, TCD, and TCV tables via ICM
Purge Utility and/or SQL Query Analyzer.
Note: Removing records impacts the availability of historical reports. Knowledge of the
HDS schema is required.
Use better hardware, especially on I/O subsystems.
RAID 1 + 0
I/O Cache – more is better
For Technology Refresh upgrades, have the fastest network possible (gigabit through one
network switch) between the source and the destination machines. Use of a crossover cable
is not recommended because it lacks buffer memory and can cause data loss.
Upgrade Guide Cisco ICM/IPCC Enterprise & Hosted Editions Release 7.0(0)
33
Chapter 5: ICM/IPCC 7.0(0) Upgrade Time and Space Requirements
Time Guidelines and Migration Performance Values