5-5
Cisco ICM Software Upgrade Migration Guide, Release 6.0(0)
 
Chapter 5      ICM 4.6.2 to ICM 5.0 Common Ground Upgrade Migration
Common Ground ICM Upgrade Migration Events
Upgrade the remaining Admin Workstation(s)
Once the ICM system has been successfully tested, the remaining Admin 
Workstations may be upgraded and started.
Upgrade the Peripheral Gateways
Peripheral Gateways may run at a release lower than a Central Controller release. 
Therefore, the Peripheral Gateways do not necessarily have to be upgraded during 
the same maintenance window  as the Central Controllers. However, it is strongly 
recommended that they be upgraded within the same week as the Central 
Controllers.
Note
When upgrading from ICM 4.6.2 to ICM 5.0, any ICM 4.6.2 Call Manager PGs 
must be at Hotfix 100 before migrating the CallRouter and/or the Logger to ICM 
5.0. If the Call Manager PGs are not at Hotfix 100 and passwords are used, users 
will not be able to login as their passwords will be different. If no passwords are 
used there is no issue.
Upgrade MS SQL Server
Note
It is recommended all operating system and ICM upgrade steps are completed, the 
historical data migration is complete, and the system is stable prior to performing 
a SQL upgrade. Verify completion by looking at the recovery log on the Logger 
and the replication log on the HDS.
When using the common ground upgrade migration method, you must have 
already upgraded to the baseline of SQL Server 7 SP3. From this SQL release you 
then have three options:
1.
Stay at SQL Server 7 SP3.
2.
Upgrade SQL Server 7 SP3 to SQL Server 7 SP4.
3.
Upgrade SQL 7 SP3/4 to SQL 2000 SP2