Cisco Headend System Release 2.7 Installation Guide

Page of 138
 
 
4036043 Rev B 
 
Introduction 
This chapter contains procedures that must be completed before you 
begin the actual upgrade to SR 2.8.1/3.8.1/4.3.1. These pre-upgrade 
procedures consist mainly of system checks, backups, and various 
operations upon the metadevices of the DNCS. 
The actual upgrade to SR 2.8.1/3.8.1/4.3.1, including some of the 
procedures in this chapter, must be completed while within a 
maintenance window. Some of the procedures of this chapter, 
however, can be completed before the maintenance window begins. 
See When to Complete These Procedures (on page 3), for a list of those 
procedures that can be completed before the start of the maintenance 
window. 
Important:  Do not remove any third-party applications files from the 
DNCS or change any of their settings before performing the SR 
2.8.1/3.8.1/4.3.1 upgrade. 
Before You Begin 
Before you begin the upgrade, attend to these two matters: 
 
Call Cisco Services and open an Upgrade Tracking Case. 
 
Verify that you have easy access to the CD-ROM containing your 
current version of Application Server software. You may need this 
CD if you ever have to roll back to the previous system release. 
 
 
Chapter 1 
SR 2.8.1/3.8.1/4.3.1  
Pre-Upgrade Procedures