Alcatel-Lucent OmniSwitch 9000 Quick Setup Guide

Page of 44
May 2007
Installing the Hardware
13
Important. Do not turn on the power supplies at this time.
9
Install all remaining power supplies by repeating steps 
1 through 8 for each power supply.
Using the Grounding Wrist Strap and 
Chassis Grounding Lug
As electrostatic discharge (ESD) can damage switch compo-
nents, such as the Network Interface (NI) and CMMs, you 
must ground yourself properly before continuing with the 
hardware installation. For this purpose, Alcatel-Lucent 
provides a grounding wrist strap and a grounding lug located 
near the bottom-right of the chassis.
To ground yourself properly, follow the steps below:
1
Fasten the provided grounding strap to your wrist.
2
Insert the wrist strap’s connector pin (located at the end 
of the strap’s tether) into the grounding lug near the 
bottom-right of the chassis, as shown:
.
Note:  The grounding lug diagram on the left is a general 
diagram only. It is intended to show the location of the 
grounding lug. No NI modules or CMMs should be 
installed in your chassis at this time.
Important. For the grounding wrist strap to be effective 
in eliminating ESD, the power supplies must be installed 
in the chassis and plugged into grounded electrical outlets 
as described on 
7x
9x
11x
13x
15x
1
7x
19x
21x
23x
2
-XNI-U2
OS9-XNI-U2
50/60Hz,
 8.0/7.0/3.5 A
100/115/250V
OVER
TEMP
DC  OK
AC
  OK
50/60Hz,
 8.0/7.0/3.5 A
100/115/250V
OVER
TEMP
DC  OK
AC
  OK
50/60Hz,
 8.0/7.0/3.5 A
100/115/250V
P
ETHERNET
COS
OLE/MDM
ETHERNET
CONSOLE/MDM
USB
LINK
AC
T
LINK
AC
T
LINK/A
CT
LINK/A
CT
2
1
LINK/A
CT
LINK/A
CT
OK1
OK2
1
2
OK1
OK2
1
2
OK1
OK2
1
2
LINK/A
CT
LINK/A
CT
LINK/A
CT
LINK/A
CT
Chassis 
Grounding Lug