3com 3C16980 User Manual
![3com](https://files.manualsbrain.com/attachments/960452ff43b9899cbcffced60c87abf956e7967a/common/fit/150/50/f6ac125d7af2cf40fec58935fa6d4bf71457a57efe50bee91208a434f325/brand_logo.jpeg)
14
C
HAPTER
1: I
NTRODUCING
THE
S
WITCH
3300
Table 3 LED behavior
LED
Color
Indicates
Port Status LEDs
*
* If your Switch has 24 10BASE-T/100BASE-TX ports, these ports are numbered 1 to 24. If your
Switch has 12 10BASE-T/100BASE-TX ports, these ports are numbered 1 to 12. For both
models, ports supplied through an Expansion Module are numbered sequentially from the last
fixed port on the front of the unit.
models, ports supplied through an Expansion Module are numbered sequentially from the last
fixed port on the front of the unit.
Packet
Yellow
Packets are being transmitted/received on the port.
Off
No packets are being transmitted/received on the
port.
port.
Status
Green
A link is present, and the port is enabled.
Green flashing
A link is present, but the port is disabled.
Off
No link is present.
Expansion Module Port Status LEDs
Packet
Yellow
Packets are being transmitted/received on the
Expansion Module port(s).
Expansion Module port(s).
Off
No packets are being transmitted/received on the
Expansion Module port(s).
Expansion Module port(s).
Status
Yellow
A valid Expansion Module is installed.
Yellow flashing
An unrecognized Expansion Module is installed.
Off
No Expansion Module is installed.
Unit LEDs
1–8
Green
The Switch forms a stack with other Switch units;
the LED indicates the position of the Switch in the
stack and that a link is present. Note that although
there are eight LEDs, only four Switch units can be
stacked at present.
the LED indicates the position of the Switch in the
stack and that a link is present. Note that although
there are eight LEDs, only four Switch units can be
stacked at present.
Off
The Switch is stand-alone.
Power/Self Test LED
Green
The Switch is powered-up.
Green flashing
The Switch is either downloading software or is
initializing (which includes running a Power On Self
Test).
initializing (which includes running a Power On Self
Test).
Yellow
The Switch has failed its Power On Self Test.
Off
The Switch is not receiving power.
16980ua.bk Page 14 Friday, April 30, 1999 9:03 AM