3com corebuilder 7000hd User Manual

Page of 24
2
32M
B
 M
EMORY
 U
PGRADE
 
I
NSTALLATION
 
ON
 
THE
 
C
ORE
B
UILDER
 7000HD S
WITCH
 
M
ODULE
32MB Memory 
Upgrade Steps
Step 1
Removing the CoreBuilder 7000HD Switch Module from the 
Chassis
Before starting, make sure that you wearing the ESD wrist strap and 
that you are properly connected to grounding equipment as 
described in “Safety Precautions” on page 1
-2.
 Disconnect the cables from the module’s ports. Ensure that there is a 
record of where the cables are attached so that you can correctly 
re-connect them to the module when finished.
 With the #1 flathead screwdriver supplied, loosen the two captive 
screws located on the far left and right of the module near the 
ejector handles 
(Figure 2-1). Do not remove the screws.