3com link 1000 User Manual

Page of 152
2-6
C
HAPTER
 2: I
NSTALLATION
 
AND
 S
ETUP
Powering-up the Switch
1
Connect the power cord to the IEC socket on the 
rear of the Switch, and to your mains socket.
The Switch has no ON/OFF switch; the only method 
of connecting or disconnecting mains power is 
through the power cord.
2
The Switch enters a Power On Self Test (POST). The 
time taken for the test to complete is dependent 
on the type of POST configured (refer to 
 for details of how 
to configure the type of POST). For a new Switch 
that is being installed for the first time, power-up 
takes approximately 13 seconds. 
3
Check the status LEDs to ensure the Switch is oper-
ating correctly (refer to 
 on 
).
Connecting a Redundant Power System (RPS)
You can connect a SuperStack
®
 II Redundant Power 
System (RPS) to the Switch.
At +5V, the current requirement for the Switch is 
4.8A, including any Transceiver Module that might 
be fitted, but excluding a Plug-in Module. Check the 
documentation supplied with your Plug-in Module 
for power consumption figures.
For most configurations, you need only one Super-
stack II RPS output, and this can be connected to 
either of the two sockets on the rear of the unit.
If the current consumption of the Switch plus any 
Plug-in Module exceeds the capability of the RPS 
(8.5A), you need a SuperStack II Advanced RPS with 
one Advanced RPS 100W Module.
If the RPS is used incorrectly, its Output Fault LED 
lights yellow.
You should check the documentation supplied with 
the RPS or Advanced RPS to see if the outputs can 
be used in parallel.