HP enterprise 9000 User Manual

Page of 44
2-2
 
R Class System Installation
Overview of System Installation
Overview of System Installation
Installation of a basic system consists of the following procedures:
1. If the server is not already integrated in a cabinet:
a. Install the rack kit into a cabinet
b. Mount the system on the cabinet rack
2. Install internal add-on options.
3. Connect the console, web console, or graphics monitor.
4. Connect the SCSI, network, and parallel cables.
5. Connect Remote Management (Access Port) card and the serial data cable for 
the optional UPS.
6. Connect system power cords.
7. Turn on power to the system.
8. Prepare for network connections.
9. Prepare for terminal connections.