Sony Bznp-D1 User Manual

Page of 74
51
Schedule Preparations
  Ch
ap
te
4  
Rou
tin
Op
e
ra
tio
n
s
Periodic schedules case A
Periodic schedules case B
To check the priority on an NSP-1, click the NSP-1 
(Remote Control) option button in the BZNP-D1 main 
window, select the desired NSP-1 in the NSP-1 drop-down 
list box, then click [Update].
After the Updating Information window is displayed, the 
list in the Content Management window shows the 
contents stored on the selected NSP-1. The periodic 
schedule that has been sent most recently, and hence has 
the highest priority, is displayed at the top of the list.
Specifying a non playout period
Periods when no playout will be done on the NSP-1 can be 
scheduled for each NSP-1 group, in the same manner as 
the playout periods.
The non playout periods have higher priority than any 
playout periods, regardless of the transferred order. You 
can specify them in advance.
Note however, that playout will not be done on these non 
playout days even if you send periodic schedules in which 
the same days are specified as the playout period.
1
In the BZNP-D1 main window, check that the BZNP-
D1 (PC) option button is selected, and select the group 
for which you want to create a new periodic schedule 
with a non playout period using the Group drop-down 
list box.
2
Select the Periodic Schedule tab of the Content 
Management window, right-click any point on the tab, 
then select [New] on the popup menu.
The Edit Periodic Schedule dialog box appears.
3
Select the No Playout option button, and specify the 
first and last days of the non playout period.
Clicking the button of the drop-down list box displays 
a calendar. The date you click on the calendar will be 
specified in the drop-down list box.
4
Place check marks for the days in the Day of the Week 
check boxes to specify specific days of the week in the 
period.
You can click each check box separately, or use the 
[Check All] or [Clear All] button.
To specify the Mondays in a period as non playout 
days, for example, click [Clear All], then click the 
Monday check box. 
5
Click [OK].
A new periodic schedule for a non playout period has 
Start date
End date
Daily schedule 
index
Transferred 
at:
07/01/2004 08/15/2004 051000001
06/30/2004 
10:00:00
08/01/2004 08/02/2004 051000002
06/30/2004 
11:00:00
Start date
End date
Daily schedule 
index
Transferred 
at:
08/01/2004 08/02/2004 051000002
06/30/2004 
10:00:00
07/01/2004 07/15/2004 051000001
06/30/2004 
11:00:00
Hint
Note