Toshiba 431A User Manual

Page of 78
47
4300 Series Ancillary Cabinets Installation and Operation Manual
1.  Run the pre-wired shunt trip cable shown in Figure 12.8 from the 431B through the 431B/UPS cable 
access port, Figure 12-5, and plug it into the corresponding MATE-N-LOK in the UPS.  
2.  Reinstall the dead fronts. 
12.7     431Bx000xxER111 Backup Runtime Tables 
The following Table 12.4 gives the typical backup runtimes at various loads for a single cabinet 
431Bx000xxER111.
Table 12.4 - 431B Typical Runtimes versus Load
UPS
Capacity
PF
Runtime in Minutes at % Full Load
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
4300
30kVA
0.8
17
21
24
30
38
45
59
>90
>90
>90
4300
30kVA
0.9
15
17
20
24
33
38
53
74
>90
>90
4300
50kVA
0.8
8
9
11
14
17
24
32
46
70
>90
4300
50kVA
0.9
7
8
9
11
15
20
26
44
60
>90
Figure 12-8 - 431B Factory Supplied 
 Shunt Trip Wiring
431B
UPS 
Power 
Input/
 
Output 
Cables
4300 Series UPS
(Battery Shunt Trip 
& Aux 1)
CB1
 +   
-
  
TB1
 1  2  7  8
(DC Power)
Figure 12-7 - 431B DC and Breaker Cable Connections
TB1
AC OUT
AC IN
U V W
U V W
N
+
N
   
TB3
 3  4  7  8