Honda cbr 954rr Service Manual
FRONT
STEERING HEAD BEARING PRE-LOAD
Jack-up the motorcycle t o raise the front wheel
off
the
ground.
Position the steering stem straight ahead.
Hook a spring scale t o the fork pipe and measure the
Hook a spring scale t o the fork pipe and measure the
steering head bearing pre-load.
The pre-load should be within
11
-
16
N
(1.1
-
1.6
If
the readings do not fall within the limits, lower the
front wheel t o the ground and adjust the steering
bearing adjusting nut.
Make sure there
is no
or wire
harness interfer-
ence
13-35