Emerson 3000 User Manual

Page of 88
Air-Cooled Models—Self-Contained Compressor
Liebert
®
 Challenger 3000
32
3.5
Air-Cooled Condenser with Liebert Lee-Temp
 “Flooded Condenser” Head 
Pressure Control System
The Liebert Lee-Temp system consists of a modulating type head pressure control valve and insulated 
receivers with heater pads to ensure operation at ambient temperatures as low as -30°F (-34.4°C). 
The Liebert Lee-Temp system can be used with any compressor choice.
Liebert Lee-Temp Piping
A discharge line and a liquid line must be field-installed between the indoor unit and the outdoor 
condenser. SeFigures 17 and 18 for details. 
Liebert Lee-Temp Controlled Materials Supplied
• Built-in,  pre-wired  condenser control box
• Air-Cooled condenser
• Piping access cover to be reinstalled when piping is complete (models with one to four fans only)
• Bolts—four per leg (3/8" x 5/8")
• Terminal block for two-wire, 24V interlock connection between unit and condenser
• Condenser legs—four with 1-fan, six on two-, three- and six-fan models and eight on four- and 
eight-fan models
• Bolts—six per receiver (3/8" x 1")
• Liebert Lee-Temp system:
• Insulated storage receiver
• Head pressure control valve with integral check valve
• Service valve
• Pressure relief valve
• Liquid level sight glass
• Check  valve
Liebert Lee-Temp Leak Check and Evacuation Procedure
Proper leak check and evacuation can be accomplished only with all system solenoid valves open and 
check valves accounted for. 
1. If unit power is available, open the unit liquid line solenoid valves using the evacuation function 
in the diagnostic section of the Liebert iCOM
®
 control. If unit power is not available, a field-
supplied 24VAC / 75VA power source must be directly connected to each of the unit solenoid 
valves.
2. Attach a jumper hose from the service valve fitting on the outlet of the receiver and the Schrader 
fitting on the discharge header of the condenser. Front-seat the service valve approximately 
two (2) turns.
3. For scroll and digital scroll compressors, connect refrigerant gauges to the suction rotalock valves 
and discharge line Schrader valves (see Note above).
4. Open the service valves and place a 150 PSIG (1034 kPa) of dry nitrogen with a tracer of 
refrigerant. Check system for leaks with a suitable leak detector. 
5. After completion of leak testing, release the test pressure (per local code) and pull an initial deep 
vacuum on the system with a suitable pump.
NOTE
Liebert Lee-Temp heater pads require a separate, continuous electrical source. See nameplate 
on unit for proper voltage.
NOTE
Systems with scroll or digital scroll compressors include a factory-installed check valve and an 
additional downstream Schrader valve with core in the compressor discharge line. Proper 
evacuation of the condenser side of the compressor can be accomplished only using the 
downstream Schrader valve. See piping schematic (Figure 18).