ACS 882.00193.00 User Manual

Page of 39
1 –Pump 9-Station Controller 
Chapter 3:  Installation 
15 of 38 
Chapter 3:  Installation 
3-1 Uncrating 
1-Pump, 9-Station Controllers are shipped mounted on a skid, enclosed in a plastic 
wrapper, and contained in a cardboard box. 
1.  Pry the crating away from the skid. 
Note:  Remove the nails holding the box to the skid and lift the box off carefully; 
avoiding staples in the 1’ x 4’ wood supports.  Cut the steel banding. 
2.  Use a pry bar to remove the blocks securing the unit to the skid. 
3.  Lift unit from sides. Use a pry bar if necessary to carefully remove the 
skid from the unit. 
4.  Lower slowly.   
3-2 
Mounting the Control Panel 
Note:  Before you mount the panel, consider how you run wiring to the vacuum 
hoppers, the filter chamber atmospheric valve (if so equipped) and the pump 
motor starter(s), vacuum switch(es), and vent valve(s).  
Mount the panel on a flat, vertical area. It should be a visible area that gives your 
operator access to the control. The panel requires a low voltage power drop as listed on 
the serial tag. 
3-3 Electrical 
Connections 
Refer to local electrical codes, the schematic and connection diagrams supplied with this 
unit and the serial tag for wiring considerations. Run all wiring in conduit if codes require 
it. 
Making Control Panel Power Drop Wiring Connections 
Hardwire the input power at 115/1/60 VAC or 220V/1/50 VAC, depending on the 
specifications, which are located on the Control Panel Serial Tag.  The main power 
switch is located on the front of the enclosure.   
Caution!  We recommend that you protect PLC memory by providing the control 
panel with a dedicated circuit, a true earth ground, and a spike/surge 
protector.