Installation
 (cont.)
Connection of power circuits
the power cables for the connections
between cubicles are not supplied;
open the doors and remove the
lower terminal shields (secured by
screws to the cubicle chassis) of the
rectifier-inverter and Static Switch
Cubicles;
connect the cables shown in heavy
lines in the wiring diagrams shown
previously to the terminals specified in
the figures below;
each cubicle must be earthed;
the routing of the power cables is
shown in the figures;
the auxiliary wiring is routed in
troughs located nearby (not shown in
the drawings);
outside the cubicles, separate the
auxiliary wiring from the power cables;
all the cubicles must be
interconnected for earthing, forming a
mesh which is itself connected to the
building structure and earthing
electrode;
the connection drawings hereafter
show the cubicles with doors open and
terminal shields removed.
Before making connections, check that
switches Q1, Q4S, Q3BP and Q5N are
in the "open" position (toggle opposite
the "O" mark).
General:
in the case of parallel-connected
rectifier-inverter cubicles with SSC,
switches Q4S and Q3BP are not
included and mains 2 is connected to
the Static Switch Cubicle. The other
connections are the same;
for modular UPSs with an external
maintenance bypass, switch Q3BP
must be locked open;
250kVA to 450kVA single-unit UPS rectifier-inverter cubicle
cross-section AA
front view
additional remote relay board
(optional)
remote relay
board
spacing
uprights
spacing
uprights
cable
tie bar
air admission
air admission
connection
from below
trough (if applicable)
rear
front
mains 1,
mains 2,
load
battery
cable tie bar
power cable routing
via the bottom
ACOZ board
A
A
Q1
L1 L2 L3
L+
L
L1 L2 L3
N
Q5N
XR7
XR6
XR5
XR9
XR8
XR3
XR4
XR2
XR1
Q3BP
Q4S
L1 L2 L3
N
off
on
off
on
off
on
off
on
XM136
XM137
air extraction
transformer
card
cage
rectifier
charger
inverter
stack
inverter
stack
inverter
stack
static
switch
card
cage
mains 1
battery
load
mains 2
FHCZ
board
450kVA
450kVA