ACS 380 m3 -hr) User Manual

Page of 63
Chapter 5:  Operation 
5-1   Pre-Startup Checks 
 
1. 
Verify that the drying hopper is clean of rust-prohibitive oil or any foreign objects. 
2. 
Verify that process and return hose connections are tight. 
3. 
If your dryer has a water-cooled aftercooler/Precooler or closed loop cooler, make sure 
that sufficient cooling water flows properly through the coil and that you have bled any 
trapped air from the system. Make sure that the aftercooler/Precooler or closed loop 
cooler has the proper supply water temperature. 
4. 
Check all companion equipment, such as the sight glass loader and drying hopper loader; 
verify that all convey tubing is in place and the loading system is ready for operation. 
5. 
Verify that all electrical connection are tight and the unit is properly grounded. 
6. 
With main power on, turn the dryer on until the process blower starts, verify blower 
rotation. (see section 3-3) 
   
 
Clean the rust-preventing oil from inside the drying hopper. 
Failure to clean the hopper fouls the desiccant and voids your warranty!
 
 
5-2   Startup 
 
1. 
Turn on (energize) the disconnect switch in your power drop. 
2. 
Turn the system ON/OFF switch to ON to energize the display panel. 
3. 
Close the slidegate at the bottom of the drying hopper. 
4. 
On three-phase models, make sure that the blowers turn in the right direction. 
5. 
Fill the drying hopper with material.  
6. 
Turn the DRYER ON/SEQUENCE SHUTDOWN switch to ON to start the dryer. 
7. 
The process blower will start.  
8. 
Set the process set point on the temperature controller to the recommend drying 
temperature provided by the resin manufacturer. Press and hold the Auto-Tune key on the 
process temperature controller for two (2) seconds to initiate the auto-tune function. 
9. 
After the proper pre-drying time for the initial hopper fill has elapsed, fully open the 
drying hopper slide gate. 
 To allow proper residence time during continuous processing, maintain 
the material level in the hopper at the midpoint of the air trap assembly. 
 
 
 
 
 
Operation 
47