Adtran MX2800 M13 User Manual

Page of 200
MX2800 M13 Multiplexer User Manual
Acceptance Test Procedure, Appendix A
61200290L1-1G
    A-5
Alarm Relay Configuration
Although there are numerous alarm configuration options available on the MX2800, the ability to generate 
only one Critical and one Noncritical alarm are the only requirements for this part of the acceptance test 
process. These requirements confirms that the alarm contacts are wired and operating correctly and trans-
mitting the appropriate alarm conditions back to the central office alarm panel.
1. From the main Configuration menu, select 
System Management
2. Select 
Alarm Relay Configuration 
to get to the 
Alarm Relay Configuration 
screen.
3. As necessary, toggle the 
DS3 LOS
 state to 
Enabled
, thus forcing generation of a Critical alarm when 
the DS3 port sees a Loss of Signal condition.
4. As necessary, toggle the 
LOS
 state to 
Enabled
, thus forcing generation of a Noncritical alarm when a 
DS1 port sees a Loss of Signal condition.
5. Toggle the 
SAVE CONFIG
 state.
4. VERIFYING THE DATA INTEGRITY
Now that the system has been properly provisioned for acceptance testing, proceed with the testing of the 
system. The first key test is to verify that the MX2800 can pass traffic between the DS1 and DS3 ports. 
Three different methods of testing are presented. One of the three should be selected based on test equip-
ment availability and network configuration. All of the tests are performed at the DSX-1 and DSX-3 cross-
connect bays or connecting equipment so that both the MX2800 circuitry and the office cabling are tested. 
If problems are encountered during testing, refer to 
 and 
 for assistance 
with problem determination.
DS1 Daisy-Chain to DS3 (Hard) Loopback
This test can be performed single-handedly, and it can be used only if DS1s are terminated at the DSX1. It 
loads all 28 ports of the MX2800 with traffic at the same time, but it does not confirm DS3 cabling integ-
rity (transmit Vs. receive).
Equipment Required: 
• 1 DS1 test set for running a BERT
• 28 DS1 bantam test cords 
• 1 DS3 test cord
Follow these procedures to test the daisy-chain.
1. At the DSX-3 cross-connect panel or connecting equipment, loop the DS3 from the MX2800 back on 
itself.   Confirm that the MX2800 sees a good DS3 signal. The 
DS3 STATUS
 LED should be solid 
green on the Active Controller, and the DS3 test set should be in frame synchronization with the 
MX2800.
2. At the DSX-1 cross-connect panel, insert the 
Transmit
 output of the DS1 test set into the 
Input
 of the 
first DS1 channel of the MX2800.