Promise Technology EX8650 User Manual
Chapter 5: Management with WebPAM PRO
111
To run PDM:
1.
In Tree View, click the Subsystem
icon.
2.
From the dropdown menu on the Background Activities tab, choose Start
PDM.
PDM.
3.
In the next screen, choose the Source and Target physical drives.
The suspect physical drive is the Source. The replacement physical drive is
the Target.
The suspect physical drive is the Source. The replacement physical drive is
the Target.
4.
Click the Start button.
Viewing Scheduled Activities
To view scheduled activities for this subsystem:
1.
Click the Subsystem
icon Tree View.
2.
Click the Scheduler tab in Management View.
Scheduling an Activity
To set a scheduled activity for this subsystem:
1.
Click the Subsystem
icon Tree View.
2.
From the dropdown menu on the Scheduler tab, choose Add BGA
Scheduler.
Scheduler.
3.
Click the option button of the activity you want:
•
•
Media Patrol. See “Running Media Patrol” on page 110
•
Redundancy Check. See “Running Redundancy Check” on page 147
•
Spare Check. See “Running Spare Check” on page 152
4.
In the Scheduler dialog box, check the Enable This Schedule box.