System Installation 
Facility Analysis 
Check the site to be sure pre-installation work has been completed 
correctly. This includes: 
†
 
Location chosen for the shelves is adequate. 
†
 
Rack (if rack mounted) is properly secured or backboard (if wall 
mounted) is properly prepared. 
†
 
Power is available. 
†
 
Wiring to Base Station locations has been pulled and correctly 
terminated. 
†
 
Phone lines for the handsets are installed and properly 
terminated. 
†
 
Telephone system administrator is on-site to program the existing 
telephone system. 
†
 
If the work has not been completed, the Polycom Field Service 
Engineer may leave the site and reschedule the installation when 
the items have been completed or corrected, or may assist in 
preparing the site. 
Check Components 
At the installation site, unpack the system carefully, verify that there 
is no shipping damage, and store in a safe place. As the field service 
engineer unpacks, he or she must confirm that contents are correct by 
comparing with the shipping documents. 
 
Before beginning the system installation, begin charging a 
handset. The Battery Packs for the handsets are not charged when 
shipped. At least one fully charged handset is required to test the 
system. 