Polycom spectralink sca516 User Manual

Page of 64
Run Cable for System  
PN: 1725-36097-001_J.doc 
19
Terminate Cable at Base Station Locations 
 After running the wire to the Base Station location, terminate the wire 
using an RJ-45 modular crimp-on plug. Connect the data pair to pins 
1 and 2, and the power pair to pins 7 and 8. 
If the connection uses more than two pair, refer to the table on the 
following page. 
 
To avoid damage to the connectors or crimps, be sure to run the 
wire to the Base Station before connecting the RJ-45 connectors. 
1
8
 
RJ-45 Modular Cable 
When wiring the 8-pin connector, use the following table as a guide. 
8-pin Modular 
Connector 
MCU Pin 
Function 
Polarity 
1 Data 
Any 
2 Data 
Any 
3 Power 
4 Power 
5 Power 
6 Power 
7 Power 
8 Power