Peerless Industries paramount pt640 User Manual

Page of 24
2 of 24
ISSUED: 10-31-07  SHEET #: 202-9242-2 03-20-08
Visit Peerless website at www.peerlessmounts.com
For customer care call 1-800-729-0307 or 708-865-8870
Tools Needed for Assembly
• stud finder ("edge to edge" stud finder is recommended)
• phillips screwdriver
• drill
• 1/4" bit for concrete and cinder block wall
• 1/2" bit for metal stud wall
• 5/32" bit for wood stud wall
• level
Table of Contents
Parts List .............................................................................................................................................................................. 3
Installation to Double Wood Stud Wall .................................................................................................................................. 4
Installation to Solid Concrete or Cinder Block ....................................................................................................................... 5
Installing Tilt Brackets ........................................................................................................................................................... 6
Installing Flat Panel Screen to Wall Plate ............................................................................................................................. 8
For customer care call (800) 865-2112 or (708) 865-8870.
Accessories
• ACC415 - Metal Stud Fastener Kit 
(Metal stud
installation is not evaluated by UL)
• PS200 - Paramount™ A/V Component Shelf
NOTE: Read entire instruction sheet before you start installation and assembly.
• Do not begin to install your Peerless product until you have read and understood the instructions and warnings
contained in this Installation Sheet. If you have any questions regarding any of the instructions or warnings, please
call Peerless customer care at 1-800-865-2112.
• This product should only be installed by someone of good mechanical aptitude, has experience with basic building
construction, and fully understands these instructions.
• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard-
ware and components.
• Never exceed the Maximum UL Load Capacity. See page one.
• If mounting to wood wall studs, make sure that mounting screws are anchored into the center of the studs. Use of an
"edge to edge" stud finder is highly recommended.
• Always use an assistant or mechanical lifting equipment to safely lift and position equipment.
• Tighten screws firmly, but do not overtighten. Overtightening can damage the items, greatly reducing their holding
power.
• This product was designed and intended to be mounted to the following supporting surfaces checked below with the
hardware included in this product as specified in the installation sheet. To mount this product to an alternative support-
ing surface, contact Peerless customer care at 1 800 865-2112.
• This product was designed to be installed on the following wall construction only;
WALL CONSTRUCTION
ADDITIONAL HARDWARE REQUIRED
Wood Stud
None
Wood Beam
None
Solid Concrete
None
Cinder Block
None
Metal Stud
Do not attach except with Peerless accessory kit for metal studs;
Contact Customer Service for Peerless accessory kit for metal studs.
Brick
Contact Customer Service
Other or unsure?
Contact Customer Service
WARNING
x
x
x
x