hearth-and-home-technolog sl-350trs-ce-d User Manual

Page of 44
Heat & Glo  •  SL-350TRS-CE-D  •  2033-900  Rev. N  •  10/07
11
Minimum Clearances from the Flue Pipe to
Combustible Materials
For Vertical
For Horizontal Sections
Sections
At Wall Firestops
Top
Bottom
Sides
Top
Bottom
Sides
7.6 cm
2.54 cm  2.54 cm
2.54 cm
6.4 cm
1.3 cm
  2.54 cm
Step 2
Framing the
Fireplace
Fireplace framing can be built before or after the
fireplace is set in place. Framing should be positioned
to accommodate wall coverings and fireplace facing
material. The diagram below shows framing reference
dimensions.
CAUTION
MEASURE FIREPLACE DIMENSIONS, AND
VERIFY FRAMING METHODS AND WALL
COVERING DETAILS, BEFORE FRAMING
CONSTRUCTION BEGINS.
Framing should be
constructed of 2 X 4 lumber or heavier.
The framing headers may rest
on the fireplace stand-offs.
Figure 4. Framing Dimensions
B
A
C
The center of the framing hole is
one inch (2.54cm) above the center
of the horizontal flue pipe.
D
VENT
FRAMING
HOLE
E
A
B
C
D
E
86,4
83,2
41,3
106
54,2