GE sg series 10 User Manual

Page of 88
 
GE
 
OPM_SGS_USM_10K_40K_0US_V010.doc 
75/88 Operating 
Manual 
SG Series 10, 20, 30 & 40 kVA 
7.4.7  Restore to normal operation after “total off” 
 
View of the panel after pressing the button total off.  
• 
All Contacts are open; 
• 
RectifierInverter and Static-Switch shutdown.
 
 
 
First operated unit
 
All other units of the system
 
 
1. Reset total off  by pressing and holding the “total off”  button and then the 
inverter on ( I ) key, on any of the Units simultaneously, until Load is supplied 
from Bypass and the Rectifiers start. 
• 
System output connects to Bypass Utility
• 
Rectifiers start with blinking LED. 
• 
At the end of Soft-start the LED’s remains lit. 
• 
The LCD screen 
on all Units
 shows: LOAD ON BYPASS”. 
 
 
First operated unit
 
All other units of the system
 
 
 
2.  Connect the Battery to all Units by closing the external Battery Switch(es) or 
Fuses.
 
Continue