GE 225 User Manual

Page of 38
 
GE
 
OPM_SGS_ISG_M22_M30_0US_V011.doc 
15/38 Installation 
Guide 
SG Series 225 & 300 kVA 
3.5  VENTILATION AND COOLING 
 
Fig. 3.5-1   Installation on plain floor 
Fig. 3.5-2   Installation on raised floor 
 
The heat produced by the UPS is transferred to the environment by its ventilation. 
 
Air inlets for UPS ventilation are located on the front of the UPS, while air outlets are on top 
of the cabinet. 
 
A suitable ventilation or cooling system must be installed to extract the heat from the UPS 
room. 
 
 
 
 
Do not put anything on the top of the cabinet. 
 
 
 
Air filtration systems could be required when the UPS operates in a dirty environment. 
Contact your Dealer or the nearest Service Center for appropriate solutions. 
 
In order to prevent overheating of the UPS, the available air intake flow rate must exceed the 
total air exhaust flow rate requirement of the UPS system. 
 
The below table indicates the heat dissipation at full Load at PF = 0.8 lag. and charged 
Battery, up to 3,280 ft (1,000 m) altitude, for cooling air 77°F (25°C) to 86°F (30°C). 
 
Losses 
Cooling air flow  
UPS rating 
BTU / hr 
kW 
CFM 
m
3
 / h 
SG Series 225 kVA 
50,512 14.80  2,541  4,317 
SG Series 300 kVA 
64,164 18.80  3,228  5,484