3.8.4 Battery 
connection 
Q1
Q2
4
3
2
1
2
3
4
1
BATTERY
PE
_
+
SG
S
_
225
-30
0_
UPS
 co
nne
cti
on 
ba
tter
y_
01US
Fig. 3.8.4-1   Power connections Battery
 
 
 
Battery 
Positive pole of the Battery – 
Negative pole of the Battery 
 
 
 
Do not insert the Battery Fuses before the commissioning. 
 
 
Battery Cable Terminations are to the Positive and Negative Terminals as shown above. 
 
Connect wire to the Lugs using appropriate tools and appropriate torque. 
 
Torque specification for Input/Output and DC power connections on Bus BarsSee section 3.8.1.