heatcraft-refrigeration-p h-im-fl1a User Manual

Page of 24
21
System Reference Data
The following information should be filled out and signed by Refrigeration Installation Contractor at time of start-up.
Date System Installed:   
_____________________________________________________
Installer and Address: 
 
_____________________________________________________
   
 
 
 
_____________________________________________________
   
 
 
 
_____________________________________________________
Condensing Unit
 
 
Unit Model#:  ________________________________________
   
 
 
 
Unit Serial #:  ________________________________________
Compressor Model #: 
____________________ Compressor Model #: _________________
Compressor Serial #: 
____________________ Compressor Serial #: __________________
   
Electrical 
_________________  Volts  __________________  Phase  _______
   
Voltage at Compressor   
L1__________   L2 ___________ 
L3 ___________
   
Amperage at Compressor 
L1__________   L2 ___________ 
L3 ___________
Service Record
A  permanent  data  sheet  should  be  prepared  on  each 
refrigeration system at an installation, with a copy for the owner 
and the original for the installing contractorʼ s files. 
If another firm is to handle service and maintenance, additional 
copies should be prepared as necessary.