Fagor nc-200 pb Installation Instruction
Page: 24 - Installation Manual - NC-200 PB
2.3.5 BLOCK CHANGE SYNCHRONISM. MODEL B
Description of the diagram according to positions 1 through 6:
1.
With X and Y axis already in position, the FAST approach is activated from
the MANUAL control station IE15 or only SLOW from the "BEND"
footswitch (I8).
the MANUAL control station IE15 or only SLOW from the "BEND"
footswitch (I8).
2.
In the change position, Y= PAR33 or programmable, the SLOW speed is
activated with the "BEND" footswitch.
activated with the "BEND" footswitch.
3.
When pinching the sheet metal, Y = thickness, it resets O29 to wait for the
return of the X axis.
return of the X axis.
4.
Once the programmed bending depth has been reached, the auxiliary
feedback Y compares the difference Y -Y' < PAR18 to begin the bending
delay, "D" attribute.
feedback Y compares the difference Y -Y' < PAR18 to begin the bending
delay, "D" attribute.
5.
After the delay "D" and depending on the selected cycle, it activates the
return:
return:
If RUN1, RUN2 - Automatic or when interrupting with I35.
If SET- With return footswitch I35.
6.
When reaching the final dead point, PAR28 or programmable, it begins the
next block.
next block.