Namco Bandai Games 90500148 User Manual

Page of 97
Page 57
 I/O 
TEST
 DIP 
1234  [ON:RED]
 
LINK 
: ON 2
 
LINK AS 
: 1 
(LEFT)
SOLENOID TEST
PULL GUN TRIGGER TO ACTION
EXIT
SELECT SW : CHOOSE      ENTER SW : ENTER
5-2-3-4
Solenoid Test
1.
Select “SOLENOID TEST” on the I/O TEST menu screen, the following
screen is displayed.
2.
The gun solenoid will operate each time the gun trigger is pulled.
3.
Select “EXIT” and press the Enter button to return to the menu screen.