Jacuzzi j-300 j-355 User Manual

Page of 64
17
J-300
Figure B Control Box
TB1
3
2
1
1.  Terminal Block
2.  Bonding Lug
3.  Grounding Terminal
GRN
WHT
WHT
BLK
BLK
BLK
RED
1
2
3
Figure-C
TB1
to Circuit 
Board
Power In
GRN
WHT
WHT
BLK
BLK
BLK
RED
RED
RED
1
2
3
Figure-D
TB1
to Circuit 
Board
Power In
Move Red 
Wire Here
north american Convertible 
models: 120 VAC, 3-Wire Connection 
60 Hz
north american Convertible 
models: 240 VAC, 4-Wire Connection 
60 Hz
  Caution (For 4-wire 240 vaC Heater operation): Move the red 
wire on the main terminal strip (TB1) from position #1 to position #3. 
Make certain wires are connected exactly as shown in Figure D before 
applying power. Failure to do so will result in damage to the circuit 
board and/or related components and void the manufactures warranty.
BLK
RED
RED
RED
BLK
BLK
1
2
Figure-E
TB1
to Circuit 
Board
Power In
Green
TB3
1
2
BLUE
BLUE
BROWN
BROWN
Figure-F
TB1
to Circuit 
Board
Power In
Green
TB3
north american 240v models:  
240 VAC, 3-Wire Connection 60 Hz
all export models: 230 VAC, 3-Wire 
Connection 50 Hz