Nortel Networks 5399 User Manual

Page of 126
Nortel Networks 5399 Access Switch Hardware Installation Guide
Chapter 2
Installing the Model 5399 Remote Access Concentrator Module
2-6
Table 2-2. Segment Selection DIP Switch Settings
Installing the Module into the Hub
To install and secure the module into the System 5000 Hub, follow these
steps:
1.
Remove the blank filler panel from the chassis slot where
you intend to install the module.
2.
Verify that the module jumpers are set correctly (see
).
3.
Extend the inserter/extractor levers to their fully extended
positions (see
).
DIP Switch S1
Switch Number
Jumper Card Connects
J5, J21 (Segment Bank 1-6)
Jumper Card Connects J5,
J22 (Segment Bank 7-12)
1 (default)
Segment 1
Segment 7
2
Segment 2
Segment 8
3
Segment 3
Segment 9
4
Segment 4
Segment 10
5
Segment 5
Segment 11
6
Segment 6
Segment 12
Network management software can override this DIP switch
setting, so an installed module may connect to a different
segment (within the segment bank) than is indicated by the DIP
switch setting.