Crestron cnrackx-dp User Manual

Page of 44
CNX Dual Processor Modular Control System  
Crestron CNRACKX-DP
 
6. From 
the 
Viewport 
File Transfer menu, select Load NVRAM from 
file as shown below. 
Load NVRAM from File 
 
7.  Browse to the directory where the file is saved and (the NVRAM file 
has a NVR extension) open the file as shown below.  
Open NVRAM File 
 
8.  Observe the Transfer in Progress dialog box as the NVRAM file is 
transferred to the active processor. 
Testing the Permanent Memory Image 
NOTE:  In order for the CNRACKX-DP to be fail-safe operational, the permanent 
memory image must be tested in both CNXCPUs. The following procedure must be 
performed on the currently active processor, the processors must be electronically 
28  
  CNX Dual Processor Modular Control System: CNRACKX-DP 
Operations Guide - DOC. 8151