CHAPTER 1  RCI Build Procedure 
7
Execute the setrci -c addconfig command on main unit B to expand the RCI 
configuration.
8
Display the RCI status  by executing the  setrci -c statcommand on main unit A.
9
Verify that the added main unit is incorporated.
1.3.5
Connection of RCI
According to the following procedure, connect different units with RCI cables by 
using a daisy-chain connection.
1
Prepare RCI branching connectors and RCI terminating resistors.
All of them are supplied with the main unit.
2
Connect the main unit and I/O units with RCI cables (see 
1
Connect the RCI branching connector (1) to the RCIport on an XSCF unit of the 
main unit.
2
Connect the RCI branching connector and the RCI port of an I/O unit with an RCI 
cable (2) by using a daisy-chain connection.
XSCF> setrci -c set 2
The command completed successfully
XSCF> setrci -c addconfig 
The command completed successfully
XSCF> setrci -c stat
HOST
 address 000102ff
 Active
LIST
 address    pwr  alm   I/F    sys-phase   ctgry  dev-cls sub-cls tm-out
 000101ff  OFF   -    ACT     --            host    0001    0b      - 
 000102ff  OFF   -    ACT     --            host    0001    0b      - 
 003001ff  OFF   -    ACT     --            disk    0400    04      -
 003002ff  OFF   -    ACT     --            disk    0400    04      -
The command completed successfully