Furuno gp-330b User Manual

Page of 28
1
1. INSTALLATION
1.1 Equipment Lists
1.2 Tools & Materials
• Mounting hardware with standard 1-14" UNS (Pole/Rail Mount installation) 
threads
• Safety goggles
• Dust  mask
• Screwdrivers (Pole/Rail Mount or Deck Mount installation)
• Teflon pipe thread tape, 1/2" wide (some installations)
• Pencil (some installations)
• Electric drill (some installations)
• Drill bits (some installations):
• Pilot hole - 3 mm or 1/8"
• Deck mount screw holes - 5.1 mm or #7
• Deck mount cable hole - 25 mm or 1"
• Flush mount stud holes - 6 mm or 1/4"
• Flush mount cable hole - 38 mm or 1-1/2"
• Loctite
®
242
®
 or other removable thread locker (Flush Mount installation)
• Cable ties (some installations)
Name
Type
Code No.
Qty
Remarks
Standard Supply
GPS 
Receiver
GP-330B
1
Installation 
Materials
CP20-03200
000-012-581
1 set
With NMEA
2000 cable (6 m)
See packing 
list at back of
manual.
CP20-03210
000-012-582
1 set
No cable
Optional Supply
Cable Assy. 22-1025-02
000-168-883-10
1
6 m, for NMEA 2000
®
Cable Assy. 22-1025-06
000-168-884-10
1
10 m, for NMEA 2000
®
Cable Assy. 22-910-03
000-168-885-10
1
10 m, for NMEA 0183
Cable Assy. MJ-A7SPF/
SRMD-100
000-144-534
1
10 m, straight, MJ7P(P)-
MJ7P(J), for NMEA 0183
Flush Mount 
Kit
-
001-037-630
1
Deck Mount 
Kit
-
001-037-640
1