rose-displays anoframe versamount screw base sq User Manual

Page of 4
Parts
35 Congress Street, Salem MA 01970
 Tel# 1-800-631-9707  Fax# 1-800-560-2890
e-mail:signware@rosedisplays.com
 AnoFrame VersaMount
TM 
Screw Base
Step 1
Locate the two split rails and the solid
rail that is the same length as the split
rails.
Insert two corner brackets into each
end of the solid side Ano rail.  Insert
one corner bracket into each end of
each split side Ano rail. Fig. 2
Note:
  Tension tabs on corner
brackets face towards outside of
frame. Fig. 1
Step 2
For ceiling application, slide screw
tabs into channel of top Ano rail.  For
wall applications, slide into side Ano
rail.  Fig. 3.
Step 3
Place one transitional collar over each
screw tab and push onto frame.  Fig. 4.
Step 4
Finish assembling frame following the
sequence in Fig. 5.
Note: Placement of split rails will
depend on type of frame.  Split rails
will be on the top for top-loading
frames and on the side for side-
loading frames.
split rails
solid rail
Instructions For Assembly
Incept-9.06.02
Figure 1
The AnoFrame VersaMount is a trademark of Rose Displays, Ltd.  Neither
the manufacturer nor any sales agent may be held liable for injury, loss
or damage resulting from the use of these products.
Part #02INSVersaMountScrewBaseSQ
Figure 3
Corner
Brackets
AnoFrame
Rails
AnoFrame
Split Rails
Figure 2
Figure 4
Screw Tabs
Transitional
Collars
Posts
Screw
Bases
Instruction Sheet (page 1 of 2)
solid rail
solid rail
split rails
Figure 5
Wood Screws
or Togglebolts
Screws
#97-0451SQ