husky-liners 54061 User Manual

Page of 1
 
                                                               PART NO.  
5406
5406 Universal Instructions.doc
Rev: 0
UNIVERSAL MUD GUARD   
INSTALLATION INSTRUCTIONS
Please read instructions thoroughly before installation.
Possible Tools Required:
• 
1/8” & 1/4” drill bit / Drill
• 
Center punch / Hammer
• 
Short Phillips screwdriver
• 
Marking utensil (fine tip marker, grease pencil, etc.)
Package Contents
• 
Driver & passenger side mud guard
• 
1” #10 screws (qty. 8)
• 
U-Clips (qty. 8)
• 
Plastic fasteners (qty. 2)
• 
Instruction sheet
NOTE:  It may be necessary to remove the wheels depending on the tools being used for installation.
1.  Clean and degrease the mud guard location areas on the fenders before installation. Determine if existing factory
fasteners and/or holes in the fenders can be used to mount the mud guards to the fenders.  You may still need to
drill  some  holes  to  completely  install  your  mud  guards,  but  existing  factory  fasteners  and  holes  should  be  used
wherever possible.
2.  If existing factory fastener(s) can be used to attach the mud guards: Remove fastener(s), align mud guard,
mark factory hole location(s) on mud guard, drill 1/4” hole thru mud guard and attach mud guard to fenders with
factory fasteners.
3.  If  an  existing  fender  hole(s)  can  be  used  to  attach  the  mud  guards:   Align  mud  guard,  mark  factory  hole
location(s) on mud guard, and drill 1/4” hole thru mud guard.   Slide U-Clip over or place behind fender hole and
attach mud guard with #10 screw thru mud guard and fender and into U-Clip.   Make sure mud guard is level with
ground before tightening fasteners.   NOTE:   A plastic fastener can be substituted for the #10 screw and U-Clip
depending on hole size.
4.  If some or all holes need to be drilled into fender:  (Figure 1) Align mud guard, mark and drill 1/8” hole (approx
1/4” from top of mud guard where possible) and attach mud guard to fender with a #10 screw.   Make sure mud
guard is level to ground before tightening.  With mud guard in place, mark and drill remaining holes and fasten with
#10 screws.   Space mounting holes evenly to insure maximum support of mud guard.