Panasonic SC-HTB520 Operating Guide

Page of 32
14
Preparation
Commercially available components (not supplied)
≥Fall prevention cord............................................................................................................................  k 2
≥Screws to attach fall prevention cord to wall ......................................................................................  k 2
≥To prevent damage or scratches, lay down a soft cloth and perform the assembly on it.
≥ Do not hold this unit in one hand to avoid injury by dropping this unit when carrying.
1
Attach a cord (not supplied) to the stand.
2
Place the stand by aligning the holes in the stand with the projecting parts F.
≥ Screw tightening torque: 80 N0cm to 120 N0cm.
≥ Keep the screws out of reach of children to prevent swallowing.
3
Place the unit in the desired position and attach each cord onto the rack or 
table.
≥ Make sure that the slack is minimal.
≥ Keep the screws out of reach of children to prevent swallowing.
When placing the unit in a rack or on a table
Follow the safety measure to prevent the unit from falling.
The installation should never be done by any other than a qualified installation specialist.
When the supplied leg stands are used
A Stand (supplied)
B Cord (not supplied)
C Thread a cord through the holes.
Refer to the Operating 
Instructions of the cord for 
details.
D Screw with washer (supplied)
E Screw hole
F Projecting part
G Height adjustment holes
≥ By changing the position that 
the stand is attached to the 
projecting parts, the height can 
be adjusted by 10 mm.
H Screw eye (not supplied)
≥ Depending on the placement of 
the unit, the screwing position of 
the screw eye may differ.
SC-HTB520EGEBGNGS_RQTX1279-B.book  Page 14  Tuesday, February 22, 2011  9:05 AM