Kicker VSS™ SubStage™ SF150S09 Owner's Manual

Page of 9
4
22. Find the three pilot holes drilled earlier and drill a 17/32” hole at each location.
23. Install the supplied nut insert using an appropriate insert installation tool.
24. Secure the mounting plate with the supplied M8 bolts.  Torque to 15ft/lbs.  
25. Install the supplied adhesive covers over the holes in the fl oor pan where the jack use to mount to pre-
vent water from entering the cabin. Fig. 11
26. Route the subwoofer harness through the hole in the carpet where the jack was located closest to the 
center of the truck.  It’s important to route the harness through the hole closest to the center of the vehicle 
too avoid interference with the subwoofer. Fig. 12
Subwoofer Installation
27. Connect the subwoofer harness to the subwoofer.  Pull any slack in the harness toward the door open-
ing and secure any excess harness to the factory wiring along the door opening with supplied wire ties.
28. Install the supplied M6 speed clips over the holes in the seat 
frame that correspond to the holes in the subwoofer mounting 
brackets.  
29. Line the bracket up with the holes in the seat frame and 
secure with the supplied M6. Fig. 13
30. Install the supplied decal over the bolt on the back of the 
subwoofer enclosure.
31. Install the fuse in the fuse holder.
32. Reinstall all previously remove parts in reverse order.
33. Reconnect negative battery cable. Torque to 7Nm.
Place your warranty card in the glove box for future use.
 
Fig. 9 
 
Fig. 10 
 
Fig. 11 
 
Fig. 12 
Harness has 
to exit from 
beneath 
carpet here. 
 
Fig. 13