Selex ES SPA F567DHDE-HP User Manual

Page of 60
 
SELEX Communications 
Information contained in this document may not be used, applied or reproduced for any purpose unless agreed 
by SELEX Communications S.p.A. in writing
 
15
 
   July 2010 
 
 
 
Customer-supplied cabinets and racks must have mounting rail and hole spacing compatible with EIA 
Universal 48.3 cm (19 inches) specifications. Cabinets must provide adequate ventilation and must 
meet the following criteria: 
•  45.0 cm (17.71 inches) deep 
•  48.3 cm (19 inches) wide 
•  13.4 cm (5.25 inches) high 
•  Two mounting rails 5 cm (2 inches) from front cabinet with front mounting holes 5.7 cm (2.25 
inches) apart (center to center). 
The front of the device is provided with four holes for M6 screws. This permits to fasten the device to a 
19” rack by means of 4 M6 screws. 
If several devices are installed in a single cabinet, be sure equipment have to be spaced at least by 
1/2 RU (2,2 cm, 0,8 inches).to allow for adequate cooling. 
Cabinets must have a least 15 cm (6 inches) of open space between the air vents and any wall or 
other cabinets. This allows adequate air flow. 
When multiple cabinets (each equipped with several repeaters) are installed in an enclosed 
area, ensure appropriate ventilation and consider air conditioning or other climate control 
equipment to satisfy the temperature requirements. 
M6 screws