Backhaul
Setting up the Backhaul Equipment
11 Attach a radio to the electronics carrier.
12 Uncoil an Ethernet cable, attach one end to a radio unit and the other end to 
the PoE. Form a service loop (extra cable) by looping the Ethernet cable over 
the top of the radio unit. If you are installing two radios on the mast, refer to 
“Installing Two Radios on the Mast” on page 69 for cabling and configuration 
instructions.
13 Ensure that all directional antennas, when raised, are pointed correctly. The 
radio unit should be facing toward the recording truck.
14 Thread guy lines through the guy line collar on the electronics carrier and 
thread through cleats on the bottom mast tube.
Figure 4–34  Hammering Guy Line Stakes