Landis+Gyr Technology Inc. CWE-WALL2 User Manual

Page of 41
fåíêçÇìÅíáçå
NJS
`ÉääåÉí=t~íÉê=båÇéçáåí=fåëí~ää~íáçå=dìáÇÉ
SAFETY AND ENVIRONMENT
Prerequisite Training
Installers should be instructed in the following safety elements as well as any site-
specific safety issues:
Hazard Communication (Employee Right to Know)
Lifting
Safe  driving
Use of hand tools
Confined space
Preliminary Checks
The installer should already be able to operate the HandHeld computer. 
Additionally, you should already have route information and the required 
number of endpoints.
Verify that you are at the correct site, specified on the handheld computer or 
work order.
Verify that the site is safe for you and your equipment.
Notify the customer of your presence. Tell the customer that you must have 
access to the water meter. If necessary, have the customer sign the work order.
When installing meters, follow any guidelines issued by your company in 
addition to those given in this guide.
Never perform an installation during a lightning storm or under excessively 
wet conditions.
Site Requirements
The site must comply with the following criteria:
There is no chance that another object will be set over the antenna.
Some instances may require additional cable. 
Maximum cable length is always 200 feet.