Dowtelecom Inc. DTP-800 User Manual

Page of 74
 
 
   
   DTP-800/DTP-1900 Operating Manual 
 
 
 
 
④  Adjust  the antenna  direction  until  the  maximum  Antenna power sign is 
displayed on the LCD screen. 
(Each bar indicates the received signal strength.  The more bars 
mean the higher signal strength, the better service condition.) 
 
☞ See 2.1 Power-Up / Power-Down 
 
 
1.2 Installation of the Wall Bracket 
 
Before finalizing the precise location of the phone, please perform the signal 
strength test to find the best location after the unit is assembled. 
 
①  In case of the concrete wall, make 3mm holes with a drill at the marked 
location and attach the Installation Panel.  When install mounting screws, 
do not screw in all the way.  Leave 2mm space between the screw head 
and the installed panel. 
 
 
 
 
 
 
 
 
 
 
 
       
 
②  On the bottom of the phone, please find the wall mounting slots(A1 ~A4).  
Install A1 and A2 onto the top screws.  And then push the wall mounting 
slots A3 and A4 onto the bottom screws so that the phone is finally 
seated. 
       
 
 
 
 
 
 
 
 
 
 
 
A1 
A2
A4
A3
B2
B1