Dowtelecom Inc. DTP-800 User Manual
DTP-800/DTP-1900 Operating Manual
3
④ Adjust the antenna direction until the maximum Antenna power sign is
displayed on the LCD screen.
(Each bar indicates the received signal strength. The more bars
mean the higher signal strength, the better service condition.)
mean the higher signal strength, the better service condition.)
☞ See 2.1 Power-Up / Power-Down
1.2 Installation of the Wall Bracket
Before finalizing the precise location of the phone, please perform the signal
strength test to find the best location after the unit is assembled.
strength test to find the best location after the unit is assembled.
① In case of the concrete wall, make 3mm holes with a drill at the marked
location and attach the Installation Panel. When install mounting screws,
do not screw in all the way. Leave 2mm space between the screw head
and the installed panel.
do not screw in all the way. Leave 2mm space between the screw head
and the installed panel.
② On the bottom of the phone, please find the wall mounting slots(A1 ~A4).
Install A1 and A2 onto the top screws. And then push the wall mounting
slots A3 and A4 onto the bottom screws so that the phone is finally
seated.
slots A3 and A4 onto the bottom screws so that the phone is finally
seated.
A1
A2
A4
A3
B2
B1