RadioFrame Networks Inc MCRB10 User Manual

Page of 167
MC-Series System Installation & Testing 
Scheduled and Unscheduled Maintenance 
RadioFrame Networks, Inc.
  
95 
Refer to Appendix C Cabling Diagrams: 3-Sector Configuration and Appendix D Cabling 
Diagrams: Omni Configuration. 
For RF Shelf 1, disconnect the following cabling from the rear of RF Shelf 1: 
Index 
Part Number 
Disconnect From 
To 
Type 
P_1 
820-0616-10 
RF Shelf 1:  power 
PDU:  RF 1 
power 
G_3 
820-0609-00 
RF Shelf 1:  ground 
GND BAR 
ground 
RF_1 
820-0611-20 
RF Shelf 1:  Tx IN A  
RBS 1:  Tx A 
RF cable
 
RF_4 
820-0611-20 
RF Shelf 1:  Rx OUT A  
RBS 1:  Rx A 
RF cable
 
RF_9 
820-0610-30 
RF Shelf 1:  TX OUT 
TOR:  Tx 1 
RF cable
 
RF_10 
820-0610-30 
RF Shelf 1:  RX IN 
TOR:  Rx 1 
RF cable
 
AL_1 
820-0607-00 
RF Shelf 1:  ALARM 
RBS:  ALARM INPUT A 
serial 
 
For RF Shelf 2, disconnect the following cabling from the rear of RF Shelf 2: 
Index 
Part Number 
Disconnect From 
To 
Type 
P_2 
820-0616-10 
RF Shelf 2:  power 
PDU:  RF 2 
power 
G_4 
820-0609-00 
RF Shelf 2:  ground 
GND BAR 
ground 
RF_2 
820-0611-20 
RF Shelf 2:  Tx IN B  
RBS 1:  Tx B 
RF cable
 
RF_5 
820-0611-20 
RF Shelf 2:  Rx OUT B 
RBS 1:  Rx B 
RF cable
 
RF_15 
820-0610-30 
RF Shelf 2:  TX OUT 
TOR:  Tx 2 
RF cable
 
RF_16 
820-0610-30 
RF Shelf 2:  RX IN 
TOR:  Rx 2 
RF cable
 
AL_2 
820-0607-00 
RF Shelf 2:  ALARM 
RBS:  ALARM INPUT B 
serial 
 
For RF Shelf 3, disconnect the following cabling from the rear of RF Shelf 3: 
Index 
Part Number 
Disconnect From 
To 
Type 
P_3 
820-0616-10 
RF Shelf 3:  power 
PDU:  RF 3 
power 
G_5 
820-0609-00 
RF Shelf 3:  ground 
GND BAR 
ground 
RF_1 
820-0611-20 
RF Shelf 3:  Tx IN C  
RBS 1:  Tx C 
RF cable
 
RF_4 
820-0611-20 
RF Shelf 3:  Rx OUT C  
RBS 1:  Rx C 
RF cable
 
RF_9 
820-0610-30 
RF Shelf 3:  TX OUT 
TOR:  Tx 3 
RF cable
 
RF_10 
820-0610-30 
RF Shelf 3:  RX IN 
TOR:  Rx 3 
RF cable
 
AL_1 
820-0607-00 
RF Shelf 3:  ALARM 
RBS:  ALARM INPUT C 
serial 
 
Remove the 4 front mounting screws and remove the RF shelf from the rack, and then 
package it for shipment.