RadioFrame Networks Inc MCRB10 User Manual

Page of 167
MC-Series System Installation & Testing 
Scheduled and Unscheduled Maintenance 
106 
RadioFrame Networks, Inc.
 
•  Tighten the blue knurled knobs on each end of the board finger tight only—do not use a 
screwdriver to tighten the screws and do not over tighten. 
 
Figure 36 
Rear of BIC (ERTM and CRTC) and AIC (ERTM only). 
Place the old board in the antistatic packaging for shipment. 
Using the breakers on the PDU, turn up the BICAIC, and RBS 1 (and RBS 2 and RBS 3 if 
present), and then verify that the components are operational before proceeding. 
Wait approximately 3 minutes for the following indicators: 
•  RBS:  The STATUS LED for each group will light green in this order: A, B, and then C.  
•  RBS:  The RADIOBLADE STATUS LEDs will light red and then green for each present 
RadioBlade. If no RB is present, the LED will not light. To verify the contents of the RBS, 
pull out the shelf (powering off is not required) and inspect the RadioBlades and their 
respective status LEDs. Reinsert the RBS. To do this, press up on one side rail locking 
arm and press down on the other side rail locking arm, and then push the unit into the 
rack (see the following illustration). 
•  BIC CRIC and AIC CRIC:  The POWER and STATUS LEDs will light red and then green. 
All other BIC and AIC card LEDs will light green. 
Using the breaker on the PDU, turn up each RF Shelf and then verify that each RF Shelf is 
operational before proceeding. 
The POWER and ALARM LEDs on the front of the RF Shelf will light green. 
 
7.9.3.4 CRTC 
Before replacing any card (board) in the BIC, power down RFN equipment in the following 
order using circuit breakers on the PDU: 
• 
BIC 
• 
AIC 
 
 
 
ERTM 
CRTC