MC-Series System Installation & Testing 
Pre-Installation 
RadioFrame Networks, Inc.
  
33 
3 Pre-Installation 
This section provides pre-installation information for the MC-Series System at a Nextel site. Prior 
to installation, prepare the site with all associated antennas, phone lines, and other related site 
equipment.  
3.1 Site 
Planning 
For each of the ensuing site planning subsections, complete the following: 
a.  Identify work to be completed by Nextel technicians and outside contractors. 
b.  Create a list of materials to be used by Nextel technicians in completing the work. 
c.  Create statements of work (SOWs) for work to be completed by outside contractors.  
3.1.1 Space 
Requirements 
Establish the following specifications to meet National Fire Protection Associations (NFPA) Code 
and American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) 
standards. Any local regulations, as applicable, shall also be adhered to.  
•  Ceiling height shall be at least 8'6” above a finished floor to allow enough space for the height 
of the cabinet and cable access at the top of the cabinet. 
•  Door dimensions shall be at least 3' wide and 6'8” high to allow equipment access. 
•  36 in. shall be maintained in front of electrical panel boards (NFPA 70, Article 110-26). 
•  36 in. aisle shall be maintained in front of the MC-Series System cabinet. 
•  30 in. aisle shall be maintained in back of the MC-Series System cabinet. 
•  No additional space is required on cabinet sides. 
•  4' x 4' wall space shall be provided for termination of T1, alarm blocks, environmental 
sensors, and the master ground bar.  
•  Rack space for associated hardware, such as a DAS system or an outside powerplant, may 
be required. 
•  If battery backup is not provided by the facility owner, include space for an auxiliary backup 
battery rack. Refer to Nextel standards for sizing and placement.  
•  As required, install overhead cable tray to support cables to and from the MC-Series System 
cabinet per the National Electric Code (NEC), which states: neither the ceiling grid nor its 
supports may be used to support cable tray or wiring.  
3.1.2 Floor 
Loading 
Refer to section 2.5.3 Floor Loading for specifications.