3.1.6  Power 
Ensure that a DC power source is available that can supply full power requirements for 
both the MC-Series system cabinet and all ancillary equipment for the installation. This 
power source may be a bulk DC power source, an internally mounted DC powerplant, or 
an external DC powerplant. For internal or external DC powerplants, backup batteries 
may or may not be required, depending on whether or not the powerplant is driven from 
an Uninterruptible Power Supply (UPS). Refer to Sprint Nextel standards for DC power 
design. 
Any installation of AC power conductors shall be done by a licensed, bonded and insured 
electrician. Follow standard Sprint Nextel design practices for AC and DC power circuits 
including any required AC surge protection. Identify any contract labor and materials 
required. 
Refer to section 2.5 “Specifications" for DC power requirements. Plan to use termination 
lugs. Type is Panduit 2-hole, P/N LCD6-14A, or equivalent. Required crimp tool is CT-
1700. 
3.1.7  Grounding 
The MC-Series system cabinet must be grounded to either a defined equipment 
grounding system in a Sprint Nextel facility or to the building grounding electrode in a 
customer facility. Plan to install a grounding system for the MC-Series system cabinet and 
ancillary hardware. Refer to Chapter 7 and Appendix C of Motorola R56, as modified by 
Sprint Nextel, for grounding standards. The Master Ground Bar (MGB) will be installed on 
the wall on the telco board. Plan to use termination lugs. Type is Panduit 2-hole, P/N 
LCD6-14A, or equivalent. Required crimp tool is CT-1700. 
3.1.8  GPS Antennas 
Refer to the Motorola Gen 3 Site Controller System Manual, 68P80801E30-O document 
and Sprint Nextel standards for GPS antenna design and installation. Per the NEC (1) 
any cabling run through an air plenum shall be plenum-rated, and (2) cabling is not to be 
laid on or suspended from any ceiling grid or attached to the grid supports. Identify any 
contract labor and materials required. 
3.1.9  T1 Service 
Install T1 cabling from the point of demarcation to the MC-Series system cabinet, and 
provide UL497B surge protection for the T1 circuit involved. Use standard Sprint Nextel-
approved surge arrestors for the T1 circuit. Per the NEC (1) any cabling run through an 
air plenum shall be plenum-rated, and (2) cabling is not to be laid on or suspended from 
any ceiling grid or attached to the grid supports. Identify any contract labor and materials 
required to extend the T1 service from the demarcation point to the MC-Series system 
cabinet. For ease of maintenance, RadioFrame Networks recommends locating the 
demarcation point (SmartJack) in the same space as the MC-Series system cabinet.  
Refer to the Motorola Gen 3 Site Controller System Manual, 68P80801E30-O document 
and Sprint Nextel standards for T1 design and installation.