USER MANUAL FOR COMFLEX 6100 1W 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 29 
 
 
 
 
3.5 
EQUIPMENT CONNECTION  
3.5.1  GROUNDING CONNECTION 
 
 
 
3.5.2  MU GROUNDING CONNECTION 
Step 1: Connect the GND cable to the GND connector and the building EARTH. Recommended GND 
cable size is # 12 AWG. 
 
Step 2: Ensure the GND cable is connected to building GND. 
 
Grounding Connector
 
Figure 26: MU Grounding (MU Rear Panel) 
 
 
3.5.3  RU GROUNDING CONNECTION 
Step 1: Connect one side of the supplied copper wire GND cable to right side of RU with two M6×10 
hexagon Screws (screws are provided). Connect the other side of the supplied copper wire GND cable to 
the building EARTH with two M6 screws (screws are not provided). 
 
Step 2: Connect one side of the supplied copper wire GND cable to RU with two M6×10 hexagon Screws 
(screws are provided). Connect the other side of the supplied copper wire GND cable to the building 
EARTH with two M6 screws (screws are not provided). 
 
Note: There are two GND ports on both sides of PSU, users can use one of them according to real 
situation. 
 
Step 3: Ensure all GND cables are well grounded to building GND. 
 
WARNING! 
This unit must always be grounded. Consult an appropriate electrical 
inspection authority or an electrician if you are uncertain that suitable 
grounding is available.
  
 
Do not connect power before grounding.