Comba Telecom Ltd. MU01-6100 User Manual
USER MANUAL FOR COMFLEX 6100
ENU STATUS : 1-0-0
Copyright - refer to title page
Page 22
Step 4: Finish installation.
Figure 13: Finish Installaiton
3.3.6 RU WALL MOUNTING
RU wall mounting steps are shown below.
Step 1: Select the wall mount location according to the following criteria:
Step 1: Select the wall mount location according to the following criteria:
General surroundings
If mounting on dry wall, 0.75 In (min) plywood backboard is required to support the weight of
If mounting on dry wall, 0.75 In (min) plywood backboard is required to support the weight of
the equipment.
Ventilated and easy-to-reach area (for maintenance and on-site inspection)
Proximity to DAS antenna in order to minimize cable loss
Proximity to DAS antenna in order to minimize cable loss
Step 2: Measure and mark the locations of 4 holes on the wall. Refer to Fig 14 for the wall drilling
dimensions of LRU and Fig 15 for the wall drilling dimensions of MRU. Use a
dimensions of LRU and Fig 15 for the wall drilling dimensions of MRU. Use a
Φ10 drill bit for masonry
bolts.