Radwin Ltd. 5XACMOD3C User Manual

Page of 122
FinM Deployment Guide
Release 4.5.10
2‐32
On‐Surface vs. Skyline / Elevated Train
Site Installation
Figure 2‐62: Exposing the tacky side of the sealing tape
3. After connecting a cable to a unit, tighten the cable gland cap firmly and use the 
insulation tape to fully cover the cable gland.
 
Figure 2‐63: Waterproofing an external connection
2.2.10 
On‐Surface vs. Skyline / Elevated Train
TBS
Height
Power
RADWIN PoE
PoE 3rd Switches
Connectors
Antennas
2X2
‐ 
Type